The built environment is estimated to account for more than 36% of the overall annual greenhouse gas emissions in Ireland [1] with transport emissions accounting for a further 17% [2]. In light of the UN’s recent report on our “woeful progress” [3] on reducing carbon emissions, the Irish Government has stated its commitment to halving our greenhouse gas emissions by 2030 and reaching net zero by 2050, but how does this affect the delivery of housing, particularly in the middle of a housing shortage? The requirement for 33,000 homes per annum [4] cannot be solely delivered from reworking existing built fabric; new construction will be essential.
While this new construction will have an environmental toll, of the 36% of greenhouse gas emissions resulting from the built environment, 23% are related to operational uses such as heating. Great, let’s focus on that. And that’s exactly what the government has done. Through regular updates to the building regulations related to energy use over the last decade, new homes must be designed to operate as Nearly Zero Energy Buildings (NZEB).
So we’ve established that new homes need to be built and the government has mandated that they be as energy-efficient as is feasible, but where will they be built? If we need 33,000 new homes a year, the majority will be required near existing population centres, which aligns with the desire for compact, sustainable growth as laid out in the National Planning Framework [5].
Looking at Dublin city, there are a few large urban sites that are arguably underutilised. I could point to the various barracks, the bus depots or even the port, and raise questions about the value of their existing use versus the benefit of redeveloping them. As Dublin contains almost 30% of the country’s population, building at a rate of 10,000 new homes a year will mean it’s only a matter of time before we have to look further afield [6].
And herein lies the crux of the issue. We need to build homes, but they can’t all fit within the boundaries of our existing cities. And yet, new infrastructure often lags housing development. So how do 33,000 new households a year navigate the country? Unfortunately, in much the same way that Henry Ford envisaged over a one-hundred years ago - with a car.
Just as environmental concerns have seeped into governmental thinking, so too have they begun to permeate almost all aspects of modern life. It might have started with recycling and then composting. A few friends might have started carrying around a reusable cup and then someone went vegan. You might even be considering an electric car. A noble thought, no doubt, but you are still thinking of buying a car, aren’t you? That is because we do not yet live in a country where car ownership is optional for the vast majority of the population.
While some progress is being made – such as local authorities actively trying to reduce the number of parking spaces in new developments, as seen in their Development Plans – we have yet to see a corresponding realisation of alternative means of transport. The most famous example is the MetroLink, announced in 2001 and now targeted for the 2030s [7]. All the bicycle parking in the world isn’t going to help someone standing in their NZEB home watching the rain splatter against a sign saying “METRO LINK: COMING SOON”.
If you build it, they will come. In Ireland we seem to operate on an inverse of the famous expression. You might build it, they’ll come anyway. So how do we develop sustainably in an imperfect reality? Can we instil clawback clauses so that car parking spaces built for residents today are transitioned into the public space of tomorrow once transport connections are delivered? Can we put a time-limit on private car parking to allow for existing car dependency while fostering future biodiversity? Simple numerical limits on car parking will not solve the climate crisis nor will they create beautiful places to live, but new ideas might do both.
Future Reference is supported by the Arts Council through the Architecture Project Award Round 2 2022.
1. R. O'Hegarty, S. Wall and O. Kinnane, Whole Life Carbon in Construction and the Built Environment in Ireland: Today, 2030, 2050, Irish Green Building Council, October 2022.
2. EPA, “Greenhouse Gas Emissions: Transport,” Environmental Protection Agency, Latest Emissions Data, July 2022.
3. D. Carrington, “World close to ‘irreversible’ climate breakdown, warn major studies”, The Guardian, October 2022.
4. Government of Ireland, Housing for All: A new Housing Plan for Ireland, Dublin, 2021.
5. Government of Ireland, Project Ireland 2040: National Planning Framework, Dublin, 2021.
6. Central Statistics Office, “Census of population 2022 - preliminary results,” Central Statistics Office, Census Statistics 2022, June 2022.
7. T. O'Brien, “Planning application for Dublin’s MetroLink lodged with Bord Pleanala”, The Irish Times, September 2022.
Website by Good as Gold.